Lorry sheds load and M25 tailbacks build up

  Posted: 25.11.21 at 13:01 by The Editor

us on Facebook

  See our new Community section




SIGNIFICANT traffic queues have built up on the Kent side of the Dartford crossing, backing up several miles on the M25 anti-clockwise carriageways.

The problem is a lorry that has shed its load on the exit from the right hand tunnel, which has been closed as a result. The accident happened at around 10am.

The left-hand tunnel remains open.

Congestion continued throughout the afternoon. There were still severe tailbacks at 3.30pm. However, with both tunnels open traffic was beginning to flow and the length of the tailbacks began to diminish, though it was still taking around a 20 minute crawl to get through.


Like this article? Sign up to our weekly newsletter...
POLICE and the ambulance service attended the scene of a crash involving one vehicle on the outskirts of Corringham last night that led to an injured ...
Read more...

Upcoming Thurrock Event...

A Commedia Christmas Carol

THURROCK residents will be able to enjoy two performances of a comedic version of Charles Dickens’ ‘A Christmas Carol’ in the run up to Christma...



Event

Share: